Avatar NX - Support for Topaz signature pads
Note - These testing guidelines assume the user is skilled in the use of, at a minimum, the following:
- DOCUMENTS TO REVIEW
- Treatment Plan
Scenario 1: Progress Notes (Group and Individual) - obtain signature
Specific Setup:
- Must have a Topaz signature pad for testing.
- The 'Progress Notes (Group and Individual)' form must have a signature field.
- A client must be enrolled in an existing episode (Client A).
Steps
- Access the 'Progress Notes (Group and Individual)' form.
- Select "Client A" in the 'Select Client' field.
- Select "Independent Note" in the 'Progress Note For' field.
- Select the desired value in the 'Note Type' field.
- Enter the desired value in the 'Notes Field' field.
- Click [Sign] in the 'Signature' field.
- Validate the 'Please Sign On Signature Pad' dialog is displayed.
- Validate the signature pad contains 4 fields:
- [OK] button
- [Clear] button
- [Cancel] button
- Signature area
- Click [Cancel] on the signature pad.
- Validate the 'Please Sign On Signature Pad' dialog is no longer displayed.
- Click [Sign] in the 'Signature' field.
- Validate the 'Please Sign On Signature Pad' dialog is displayed.
- Sign on the signature pad.
- Validate the 'Please Sign On Signature Pad' dialog contains the signature.
- Click [Clear] on the signature pad.
- Validate the signature is cleared from both the signature pad and the 'Please Sign On Signature Pad' dialog.
- Sign again on the signature pad.
- Validate the 'Please Sign On Signature Pad' dialog contains the new signature.
- Click [OK] on the signature pad.
- Validate the 'Please Sign On Signature Pad' dialog is no longer displayed.
- Validate the 'Signature' field contains the new signature.
- Select "Final" in the 'Draft/Final' field.
- File the note.
Scenario 2: Treatment Plan - obtain signature
Specific Setup:
- Must have a Topaz signature pad for testing.
- The 'Treatment Plan' form must have a signature field.
- A client must be enrolled in an existing episode (Client A).
Steps
- Select "Client A" and access the 'Treatment Plan' form.
- Enter the desired date in the 'Plan Date' field.
- Select the desired value in the 'Plan Type' field.
- Select "Draft" in the 'Treatment Plan Status' field.
- Click [Launch Plan].
- Add the desired treatment plan items.
- Click [Return To Plan].
- Click [Sign] in the 'Signature' field.
- Validate the 'Please Sign On Signature Pad' dialog is displayed.
- Validate the signature pad contains 4 fields:
- [OK] button
- [Clear] button
- [Cancel] button
- Signature area
- Click [Cancel] in the signature pad.
- Validate the 'Please Sign On Signature Pad' dialog is no longer displayed.
- Click [Sign] in the 'Signature' field.
- Validate the 'Please Sign On Signature Pad' dialog is displayed.
- Sign on the signature pad.
- Validate the 'Please Sign On Signature Pad' dialog contains the signature.
- Click [Clear] on the signature pad.
- Validate the signature is cleared from both the signature pad and the 'Please Sign On Signature Pad' dialog.
- Sign again on the signature pad.
- Validate the 'Please Sign On Signature Pad' dialog contains the new signature.
- Click [OK] on the signature pad.
- Validate the 'Please Sign On Signature Pad' dialog is no longer displayed.
- Validate the 'Signature' field contains the new signature.
- Select "Final" in the 'Treatment Plan Status' field.
- Submit the form.